Wednesday, August 23, 2017
RAKING THE BEACH
The Conservancy Workers take special pride in the appearance of the beach, parks, road sides, etc. It's been a challenge this summer with the installation of the new water line along Nineveh Road.
OX ROAST
The annual Ox Roast is coming on Saturday, September 2nd of Labor Day Weekend. Come for good eats and displays by various vendors.
Monday, August 21, 2017
TREE WORK
This looks like the hard way to take a tree down. This tree was in between two houses close together. There are a lot of Ash trees dying in the area.
Thursday, August 17, 2017
PARKING LOT UPGRADES
In preparation of the coming OX ROAST, the CSLOA has hired local excavation person Jerry Cleefman to grade and improve the parking lot at the clubhouse. Other work being done includes the yard work clean up from the recent water line installation.
Friday, August 4, 2017
IT'S ALL ABOUT WATER
The North Water Tower is undergoing a revitalization inside and outside. It is normal maintenance required every few years. In addition the new water main being installed has reached the North Water Tower.
Thursday, August 3, 2017
SOUTH CENTRAL REMC TREE TRIMMING
South Central REMC has been going through the area and trimming off dead trees and branches that have the opportunity to fall on the power lines. They usually do not cut the entire tree down and they usually leave the pile of branches and limbs for the property owner to clean up.
Subscribe to:
Posts (Atom)