Equipment arrived today to the Cordry Spillway area. Some area on the backside was cleared for "work room" on the backside of the spillway. The actual project is to replace the metal spillway tube that was installed back in the 1960's. It has rusted through allowing water run-off to undermine the area underneath the tube and cement on the spillway.