Work continues on the Cordry Lake Spillway. A large flat area southeast of the spillway which previously was a "wet" area has had drainage installed and was addressed with rip rap. The approach area west of the spillway is being graded and prepared for a roadway for trucks and material can be delivered to the site. Center Lake Road remains open.